This website is also available in other languages. Would you like to switch to a different language?
Deutsch | English | Français

This website contains information on countries and markets. For the specific country or market specific information, please select the corresponding website:

Bauma Demonstrations
Contact
DEMONSTRATIONS AT TRACTO STAND FN.520/1

TRENCHLESS TECHNOLOGY LIVE

EXPERIENCE THE CONSTRUCTION SITE OF THE FUTURE!

Experience the efficiency and sustainability of trenchless technology through practical demonstrations. We will be showing examples of trenchless solutions for the construction of main grids and distribution networks, the installation of service connections and the modernisation of existing networks using new and proven NODIG systems.

 

The demonstrations take place daily from Monday to Saturday in German and English and last 10-15 minutes each. Come and see for yourself!

 

  • 11:00: Productive solutions for house connections
  • 12:30: Flexible solutions for distribution networks
  • 14:00: Cost-effective solutions for main grid
  • 15:30: Long-term solutions for pipe renewal​​​​​​​
07.-12.04.2025 | 11:00 | HOUSE CONNECTION

EFECTIVE SOLUTIONS FOR ON-TARGET HOUSE CONNECTIONS

You will learn how the productive and durable NODIG systems from TRACTO can be used to produce house connections quickly and right on target under all conditions.

 

As an example, you will see the GRUNDOPIT PS60 HDD pit drilling rig in action and become familiar with the matching drilling tools for piloting, expansion and pipe pulling.

07.-12.04.2025 | 12:30 | DISTRIBUTION NETWORKS

FLEXIBLE SOLUTIONS FOR RELIABLE INFRASTRUCTURE

We will be showing you NODIG systems that can be perfectly tailored to the requirements, enabling you to construct distribution networks in existing infrastructures safely and quickly.

 

Highlights include the new HDD rock drilling rig GRUNDODRILL 20ACS and the low-emission GRUNDODRILL JCS130E with electric drive. The JCS130E will be shown with the new inliner drill rods and the ORFEUS drill head for detecting obstacles in the drill path.

07.-12.04.2025 | 14:00 | MAIN GRID

ECONOMICAL SOLUTIONS FOR LONG DISTANCES

You will get to know the precisely working and productive HDD systems from TRACTO, with which long drillings in route construction can be planned and made profitable in the long term.


A special focus will be on the new GRUNDODRILL JCS300 with 70 x 4.5 m long drill rods for jet bores up to more than 300 m. We will show you the ‘long distance hero’ as a prototype.

07.-12.04.2025 | 15:30 | PIPE RENEWAL

LONG-TERM SOLUTIONS FOR INTACT INFRASTRUCTURE

You will learn about our versatile pipe bursting systems and understand why the complete renewal of pipes in the existing route is the most sustainable form of pipe rehabilitation.

 

As an example of the efficiency of bursting technology, we present the compact GRUNDOBURST 400G with accessories for brittle old pipe materials and the special QuickLock bursting rods in detail.